MN
Grand Rapids P-2362
General information | |
| Waterway |
Mississippi River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2362 |
| FERC project name | Grand Rapids |
| Permit issued | 2/21/93 |
| Permit expiration | 12/27/23 |
Ownership and operation | |
| Owner | Minnesota Power Inc |
| Owner type | Investor-Owned Utility |
| Year first online (conventional hydro) | 1943 |
| Transmission or distribution system owner | ALLETE, Inc. |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.9 MW |
| Average annual net hydropower generation | 6,797.8 MWH |
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From American Rivers 11/04/22
The mighty Mississippi running dry: what you need to know
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

