Green Peter
General information | |
Waterway |
South Santiam River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Reregulating |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-North Pacific Division |
Owner type | USACE |
Year first online (conventional hydro) | 1967 |
Transmission or distribution system owner | Bonneville Power Administration |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 80.0 mW |
Average annual net hydropower generation | 233,282.0 mWH |