VT

Green River P-2629

General information

Waterway  Green River
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-2629
Permit issued 8/23/1981
Permit expires 4/26/2015

Ownership and operation

Owner Village of Morrisville
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1983
Transmission or distribution system owner Village of Morrisville - (VT)

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 1.8 mW
Average annual net hydropower generation 1,009.9 mWH

From our Resource Library

Case Studies

Bear River Project

See all resources