Greers Ferry Lake
General information | |
| Waterway |
Greers Ferry Lake |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | US Army Corps of Engineers |
Ownership and operation | |
| Owner | USCE-Little Rock District |
| Owner type | USACE |
| Year first online (conventional hydro) | 1964 |
| Transmission or distribution system owner | Southwestern Power Administration |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 96.0 MW |
| Average annual net hydropower generation | 195,381.2 MWH |