CO

Harvey Gap 50 Hydroelectric Project P-14342

General information

Waterway  GRASS VALLEY CANAL
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-14342
Permit issued 7/27/2012

Ownership and operation

Owner Silt Water Conservancy District
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.1 mW
Average annual net hydropower generation 410.0 mWH

From our Resource Library

License summaries, Southeast

Claytor Project, New River, Virginia

See all resources