CA

Hatchet Creek Project P-5931

General information

Waterway  Hatchet Creek
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-5931
Permit issued 5/4/1985
Permit expires 4/26/2035

Ownership and operation

Owner Mega Renewables
Owner type Private Non-utility
Year first online (conventional hydro) 1986
Transmission or distribution system owner Pacific Gas & Electric Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 6.8 mW
Average annual net hydropower generation 16,176.5 mWH

From our Resource Library

License summaries, Northwest

Henry Jackson, Sultan River, Washington

Case Studies

Bear River Project

See all resources