AZ
Headgate Rock
General information | |
| Waterway |
Colorado River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | Unknown |
Ownership and operation | |
| Owner | Colorado River Indian Irr Proj |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1993 |
| Transmission or distribution system owner | Colorado River Indian Irr Proj |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 19.5 MW |
| Average annual net hydropower generation | 76,651.9 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From American Whitewater 05/25/23
Grand Canyon Flow Management Delayed Again (AZ) - From American Rivers 07/20/22
I’m a River Guide and Water Lawyer. I’m Scared for the Grand Canyon. - From American Rivers 02/22/21
Colorado River Futures – “Climate & the River” Edition - From American Rivers 02/10/21
Future of the Colorado River – the “Changed River” edition - From American Rivers 02/02/21
New report confronts tough choices for the future of the Colorado River
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

