GA

High Shoals Hydro P-3102

General information

Waterway  Apalachee River
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-3102
Permit issued 8/2/1981
Permit expires 8/26/2021

Ownership and operation

Owner JASON & CAROL VICTORIA PRESLEY
Owner type Private Non-utility
Year first online (conventional hydro) 1988
Transmission or distribution system owner Georgia Power Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 1.4 mW
Average annual net hydropower generation 781.5 mWH