NC
Hiwassee Dam
General information | |
Waterway |
Hiwassee River |
Current status | Active license  |
Type of facility | Conventional Hydro, Pumped Storage |
Mode of hydropower generation | Peaking |
Type of permit | TVA |
Ownership and operation | |
Owner | Tennessee Valley Authority |
Owner type | TVA |
Year first online (conventional hydro) | 1940 |
Year first online (pumped storage) | 1956 |
Transmission or distribution system owner | Tennessee Valley Authority |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 70.6 MW |
Average annual net hydropower generation | 198,752.9 MWH |
Total capacity from pumped storage turbine-generator units | 95.0 MW |
Pumped storage gross generation in megawatt hours for each powerplant | 90,698.8 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Eric Rounds9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition
From Eric Rounds9/9/2024