MI

Hodenpyl P-2599

General information

Waterway  Manistee River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-2599
FERC project name Hodenpyl
Permit issued 7/10/94
Permit expiration 6/26/34

Ownership and operation

Owner Consumers Energy Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1925
Transmission or distribution system owner Consumers Energy Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 17.0 MW
Average annual net hydropower generation 43,534.1 MWH
  • Two existing earth embankment dam sections
  • An existing impoundment with a storage area of 1,665 acre-feet
  • A powerhouse containing 2 generating units
  • Transmission facilities, and appurtenant facilities
For a detailed description of this project and the Tippy project included in the Consumers Settlement Agreement, read this summary.

Is there something you’d like to add or correct? Please let us know.