NV
Hoover Dam
General information | |
Waterway | Lake Mead - Colorado River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Intermediate Peaking |
Type of permit | Reclamation |
Ownership and operation | |
Owner | Reclamation Lower Colorado Region (LC) |
Owner type | Reclamation |
Year first online (conventional hydro) | 1936 |
Transmission or distribution system owner | WAPA-- Western Area Power Administration |
Power and generating capacity | |
Number of units | 9 |
Total capacity from hydraulic turbine-generator units within each plant | 1,039.4 mW |
Average annual net hydropower generation | 2,022,887.8 mWH |
Related posts
- From American Rivers 10/02/21
Future of the Colorado River – the “Changed River” edition - From American Rivers 02/02/21
New report confronts tough choices for the future of the Colorado River
News and updates
From American Rivers2/18/2021
From California Trout2/16/2021