NY
Hydraulic Race P-2424
General information | |
| Waterway |
Barge Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-2424 |
| FERC project name | Hydraulic Race |
| Permit issued | 11/22/90 |
Ownership and operation | |
| Owner | Erie Boulevard Hydropower LP |
| Owner type | Wholesale Power Marketer |
| Year first online (conventional hydro) | 1942 |
| Transmission or distribution system owner | Niagara Mohawk Power Corp. |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 3.0 MW |
| Average annual net hydropower generation | 10,732.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

