SC

J Strom Thurmond

General information

Waterway  Savannah River
Current status   Active license 
Type of facility Conventional Hydro
Type of permit US Army Corps of Engineers

Ownership and operation

Owner USCE-Savannah District
Owner type USACE
Year first online (conventional hydro) 1953
Transmission or distribution system owner Duke Energy Carolinas, LLC

Power and generating capacity

Number of units 7
Total capacity from hydraulic turbine-generator units within each plant 361.9 MW
Average annual net hydropower generation 551,562.7 MWH

Is there something you’d like to add or correct? Please let us know.