CA
Jaybird P-2101
General information | |
Waterway | South Fork Silver Creek |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2101 |
FERC project name | Upper American River |
Other projects with this FERC number | |
Permit issued | 7/18/2014 |
Permit expires | 6/26/2064 |
Ownership and operation | |
Owner | Sacramento Municipal Util Dist |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1961 |
Transmission or distribution system owner | Sacramento Municipal Util Dist |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 161.6 mW |
Average annual net hydropower generation | 492,196.0 mWH |
Related resources
- Activists’ Preparation Guide (Case Studies, Hydro guides)
- Upper American Project, Upper American River, California (License summaries, Pacific)
News and updates
From Trout Unlimited2/26/2021
From California Trout2/26/2021