OK
Keystone
General information | |
| Waterway |
Arkansas River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | US Army Corps of Engineers |
Ownership and operation | |
| Owner | USCE-Tulsa District |
| Owner type | USACE |
| Year first online (conventional hydro) | 1968 |
| Transmission or distribution system owner | Southwestern Power Administration |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 70.0 MW |
| Average annual net hydropower generation | 231,545.7 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

