CA
Kings River P-1988
General information | |
| Waterway |
North Fork Kings River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Peaking |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-1988 |
| FERC project name | Haas-Kings River |
| Other projects with this FERC number | |
| Permit issued | 3/1/01 |
| Permit expiration | 2/24/41 |
Ownership and operation | |
| Owner | Pacific Gas & Electric Co |
| Owner type | Investor-Owned Utility |
| Year first online (conventional hydro) | 1962 |
| Transmission or distribution system owner | Pacific Gas & Electric Co |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 48.6 MW |
| Average annual net hydropower generation | 139,176.0 MWH |
Is there something you’d like to add or correct? Please let us know.
Related posts
- From South Yuba River Citizens League 11/14/23
PG&E and PacGen: A risky proposal for the Yuba River, our community, and ratepayers. - From American Whitewater 10/11/23
PG&E Proposal Impacts 500 Miles of CA Rivers
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

