CA
Kings River Siphon Powerhouse P-9399
General information | |
| Waterway |
Friant-Kern Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-9399 |
| FERC project name | Kings River Siphon |
| Permit issued | 7/24/87 |
| Permit expiration | 6/26/37 |
Ownership and operation | |
| Owner | Orange Cove Irrigation District |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1990 |
Power and generating capacity | |
| Number of units | 4 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.3 MW |
| Average annual net hydropower generation | 3,700.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

