Lewis Smith P-2165
General information | |
Waterway |
Black Warrior River Sipsey Fork |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2165 |
FERC project name | Warrior River |
Other projects with this FERC number | |
Permit issued | 3/26/10 |
Permit expiration | 2/24/40 |
Ownership and operation | |
Owner | Alabama Power Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1961 |
Transmission or distribution system owner | Alabama Power Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 181.0 MW |
Average annual net hydropower generation | 246,080.8 MWH |
The Warrior River Hydroelectric Project includes the Lewis Smith and Bankhead developments.
The Lewis Smith development is located in north central Alabama in the headwaters of the Black Warrior River on the Sipsey Fork in Cullman, Walker, and Winston Counties.
The Bankhead development is located in west central Alabama downstream of the Lewis Smith development, on the Black Warrior River in Tuscaloosa County.
The Lewis Smith development occupies 2,691.44 acres of federal lands administered by the U.S. Forest Service, and the Bankhead development occupies 18.7 acres of federal lands administered by the Bureau of Land Management.
Milestones
Draft EA Released | 03-07-2008 |
License Order Issued | 03-31-2010 |
Is there something you’d like to add or correct? Please let us know.
Related resources
News and updates
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts
From South Yuba River Citizens League9/25/2024
NID Withdraws Centennial Dam Proposal After SYRCL’s Decade-Long Opposition