MT
Libby
General information | |
Waterway |
Kootenai River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | US Army Corps of Engineers |
Ownership and operation | |
Owner | USCE-North Pacific Division |
Owner type | USACE |
Year first online (conventional hydro) | 1975 |
Transmission or distribution system owner | Bonneville Power Administration |
Power and generating capacity | |
Number of units | 5 |
Total capacity from hydraulic turbine-generator units within each plant | 525.0 mW |
Average annual net hydropower generation | 2,154,919.8 mWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited3/23/2023
NOAA biological opinion unrealistic for Kennebec River recovery
From South Yuba River Citizens League3/20/2023
SYRCL’s 40th Anniversary Film YUBA IS THE HEART is now available to view.