Long Lake P-2545
General information | |
Waterway | Spokane River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2545 |
FERC project name | Spokane River |
Other projects with this FERC number | |
Permit issued | 6/13/2009 |
Permit expires | 5/27/2059 |
Ownership and operation | |
Owner | Avista Corp |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1915 |
Transmission or distribution system owner | Avista Corp |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 70.0 mW |
Average annual net hydropower generation | 495,212.6 mWH |
The Spokane River project consists of a series of seven dams on the Spokane River between Coeur d’Alene Lake in Idaho and its confluence with the Columbia River in Washington.