WA
Long Lake P-2545
General information | |
Waterway |
Spokane River |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Peaking |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2545 |
FERC project name | Spokane River |
Other projects with this FERC number | |
Permit issued | 6/13/09 |
Permit expiration | 5/27/59 |
Ownership and operation | |
Owner | Avista Corp |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1915 |
Transmission or distribution system owner | Avista Corp |
Power and generating capacity | |
Number of units | 4 |
Total capacity from hydraulic turbine-generator units within each plant | 70.0 MW |
Average annual net hydropower generation | 495,212.6 MWH |
The Spokane River project consists of a series of seven dams on the Spokane River between Coeur d’Alene Lake in Idaho and its confluence with the Columbia River in Washington.
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League9/14/2023
From California Sportfishing Protection Alliance9/13/2023
Good News for Fish: Clean Water Act Holds for PG&E Hydropower Projects on Yuba and Bear Rivers