Los Vaqueros Pipeline Energy Recovery P-13524

General information

Waterway  CONTRA COSTA CANAL
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-13524
Permit issued 1/14/2010

Ownership and operation

Owner Contra Costa Water District
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 1.0 mW
Average annual net hydropower generation 4,400.0 mWH