MI
Loud P-2449
General information | |
Waterway |
Au Sable River |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Reregulating |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2449 |
FERC project name | Loud |
Permit issued | 7/10/94 |
Permit expiration | 6/26/34 |
Ownership and operation | |
Owner | Consumers Energy Co |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1913 |
Transmission or distribution system owner | Consumers Energy Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 4.0 MW |
Average annual net hydropower generation | 17,682.8 MWH |
- Two existing earth embankment dam sections
- A concrete slab and buttress spillway section
- An existing impoundment with a storage area of 1,056 acre-feet
- A powerhouse containing 2 generating units
- Transmission facilities, and appurtenant facilities
For a detailed description of this project and 10 others included in the Consumers Settlement Agreement, read this summary.
Is there something you’d like to add or correct? Please let us know.
News and updates
From Idaho Rivers United1/14/2025
Federal agencies prepare a SEIS to update the Columbia River System Operations
From California Sportfishing Protection Alliance1/1/2025
CSPA Sues California over Operations of the State Water Project