ID

Low Line No. 8 P-5056

General information

Waterway  Lowline Canal
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-5056
FERC project name Low Line No. 8
Permit issued 10/18/81

Ownership and operation

Owner Boise Project Board of Control
Owner type Publicly Owned Utility

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.4 MW
Average annual net hydropower generation 1,500.0 MWH

Is there something you’d like to add or correct? Please let us know.