ID
Main Canal No. 6 P-5038
General information | |
| Waterway |
Main Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-5038 |
| FERC project name | Main Canal No. 6 |
| Permit issued | 10/18/81 |
Ownership and operation | |
| Owner | Boise Project Board of Control |
| Owner type | Publicly Owned Utility |
Power and generating capacity | |
| Number of units | 3 |
| Total capacity from hydraulic turbine-generator units within each plant | 1.1 MW |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

