Mayfield P-2016

General information

Waterway  Cowlitz River
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river/Upstream Peaking
Type of permit FERC License

FERC information

FERC docket # P-2016
Permit issued 3/8/2002
Permit expires 4/7/2037

Ownership and operation

Owner Tacoma City of
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1963
Transmission or distribution system owner City of Tacoma - (WA)

Power and generating capacity

Number of units 4
Total capacity from hydraulic turbine-generator units within each plant 162.0 mW
Average annual net hydropower generation 704,741.5 mWH