McClure P-10855


General information

Waterway  Dead River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-10855
FERC project name Dead River
Other projects with this FERC number
Permit issued 9/29/02
Permit expiration 9/26/42

Ownership and operation

Owner Upper Peninsula Power Co
Owner type Investor-Owned Utility
Year first online (conventional hydro) 1988
Transmission or distribution system owner Upper Peninsula Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 8.0 MW
Average annual net hydropower generation 35,040.9 MWH

This project consists of the following three developments:

Silver Lake
  • No generation capacity
  • A 1,500-foot-long earthen dam with a spillway, a 15-foot-long outlet structure,
  • Four earthen saddle dikes
  • 1,464-acre Silver Lake reservoir
Dead River (Hoist)
  • 4,602-foot-long concrete gravity dam with a spillway
  • A 3,202-acre reservoir
  • A 342- foot-long rock tunnel connected to a 193-foot-long steel penstock
  • A powerhouse containing three turbine generating units with a total installed capacity of 5.5 MW
  • The Hoist Development has a 1,000-foot bypassed stream reach
McClure
  • 1,874-foot-long concrete gravity dam with a spillway
  • A 95.9-acre reservoir
  • A powerhouse containing two turbine generating units with a total installed capacity of 10 MW
  • A 13,302-foot-long penstock, a surge tank; a tailrace, and an electrical substation
  • The McClure development has a 6.1-mile-long bypassed reach
Read this summary for more on the project.

Is there something you’d like to add or correct? Please let us know.

Related resources

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates