TN
Melton Hill
General information | |
| Waterway |
Clinch River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | TVA |
Ownership and operation | |
| Owner | Tennessee Valley Authority |
| Owner type | TVA |
| Year first online (conventional hydro) | 1964 |
| Transmission or distribution system owner | Tennessee Valley Authority |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 72.0 MW |
| Average annual net hydropower generation | 141,188.7 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

