General information

Waterway  Mitchell Butte Canal
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC License

FERC information

FERC docket # P-5357
FERC project name Mitchell Butte Lateral
Permit issued 12/9/84
Permit expiration 11/26/34

Ownership and operation

Owner Gem, Owyhee and Ridgeview Irrigation Districts
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1989
Transmission or distribution system owner Idaho Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 1.8 MW
Average annual net hydropower generation 4,608.3 MWH