OR
Michell Butte Power Project P-5357
General information | |
Waterway |
Mitchell Butte Canal |
Current status | Active  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-5357 |
FERC project name | Mitchell Butte Lateral |
Permit issued | 12/9/84 |
Permit expiration | 11/26/34 |
Ownership and operation | |
Owner | Gem, Owyhee and Ridgeview Irrigation Districts |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1989 |
Transmission or distribution system owner | Idaho Power Co |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 1.8 mW |
Average annual net hydropower generation | 4,608.3 mWH |
News and updates
From Idaho Rivers United6/20/2022
“The Grand Salmon” team welcomed by Nez Perce in Lewiston, where the Snake River ‘is dead.’
From California Sportfishing Protection Alliance6/20/2022