Moose River P-4349

General information

Waterway  Moose River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-4349
FERC project name Moose River
Permit issued 5/1/86
Permit expiration 4/26/26

Ownership and operation

Owner EONY GENERATION LIMITED
Owner type Wholesale Power Marketer
Year first online (conventional hydro) 1987
Transmission or distribution system owner Niagara Mohawk Power Corp.

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 12.6 MW
Average annual net hydropower generation 44,676.6 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From California Sportfishing Protection Alliance11/24/2024

FERC Holds PG&E Accountable for 2023 Butte Canal Failure

See all news and updates