AZ
Mormon Flat
General information | |
Waterway | Salt River |
Current status | Active  |
Type of facility | Conventional Hydro, Pumped Storage |
Mode of hydropower generation | Peaking |
Type of permit | Transferred |
Ownership and operation | |
Owner | Salt River Valley Water User's Association |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1926 |
Year first online (pumped storage) | 1971 |
Transmission or distribution system owner | Salt River Project |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 9.2 mW |
Average annual net hydropower generation | 13,324.6 mWH |
Total capacity from pumped storage turbine-generator units | 54.3 mW |
Pumped storage gross generation in megawatt hours for each powerplant | 86,636.6 mWH |
Related posts
- From American Rivers 10/02/21
Future of the Colorado River – the “Changed River” edition - From American Rivers 02/02/21
New report confronts tough choices for the future of the Colorado River
News and updates
From American Rivers2/18/2021
From California Trout2/16/2021