MA

Nonotuck Mill P-2771

General information

Waterway  Holyoke Canal
Current status   Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC License

FERC information

FERC docket # P-2771
FERC project name Nonotuck Mill
Permit issued 6/24/89
Permit expiration 2/24/21

Ownership and operation

Owner City of Holyoke Gas and Electric Dept.
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1982
Transmission or distribution system owner City of Holyoke - (MA)

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.5 mW
Average annual net hydropower generation 2,142.0 mWH

News and updates

From California Trout10/12/2021

Major Milestone Met to Protect Mono Basin Ecosystem

From Appalachian Mountain Club10/12/2021

Inclusive Outdoors Project: Improving Access to the Outdoors

See all news and updates