VT

North Branch 3 P-5124

General information

Waterway  North Branch Winooski River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-5124
FERC project name North Branch No 3
Permit issued 11/18/82
Permit expiration 10/27/22

Ownership and operation

Owner Washington Electric Coop Inc
Owner type Cooperative
Year first online (conventional hydro) 1985
Transmission or distribution system owner Washington Electric Coop - (VT)

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 1.0 MW
Average annual net hydropower generation 2,800.8 MWH

Is there something you’d like to add or correct? Please let us know.