MI

Norway Point P-2404


General information

Waterway  Thunder Bay
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-2404
FERC project name Thunder Bay River
Other projects with this FERC number
Permit issued 12/6/98
Permit expiration 11/26/38

Ownership and operation

Owner Thunder Bay Power Co
Owner type Private Non-utility
Year first online (conventional hydro) 1990
Transmission or distribution system owner Alpena Power Co

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 4.0 MW
Average annual net hydropower generation 15,271.9 MWH

Is there something you’d like to add or correct? Please let us know.