CO
Pandora Water System Project CD14-5
General information | |
| Waterway |
Conduit/Canal |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Qualifying Conduit |
FERC information | |
| FERC docket # | CD14-5 |
| Permit issued | 1/2/14 |
Ownership and operation | |
| Owner | Town of Telluride |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 2014 |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.3 MW |
| Average annual net hydropower generation | 2,135.0 MWH |