Pelican P-10198

General information

Waterway  Lisianski Inlet, Pelican Creek
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC License

FERC information

FERC docket # P-10198
Permit issued 4/22/1988
Permit expires 9/12/2026

Ownership and operation

Owner City of Pelican, AK
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1984
Transmission or distribution system owner Pelican Utility

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 1.4 mW
Average annual net hydropower generation 850.7 mWH