Perdue Water Treatment Plant Hydroelectric Project CD15-30

General information

Waterway  Conduit/Canal
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD15-30
Permit issued 9/12/15

Ownership and operation

Owner Sweetwater Authority
Owner type Publicly Owned Utility
Year first online (conventional hydro) 2017

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 0.7 MW
Average annual net hydropower generation 3,784.0 MWH