UT
Pigeon Creek P-9041
General information | |
| Waterway |
Nichols Branch |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Canal/Conduit |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-9041 |
| FERC project name | Pigeon Creek |
| Permit issued | 11/20/85 |
Ownership and operation | |
| Owner | Levan Town Corporation |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1987 |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.2 MW |
| Average annual net hydropower generation | 1,001.0 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Trout1/21/2026
From South Yuba River Citizens League1/21/2026
The PERMIT Act Passed the House: What It Means for the Yuba River Watershed

