MN
Pillager P-2663
General information | |
Waterway |
Crow Wing |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Run-of-river |
Type of permit | FERC License |
FERC information | |
FERC docket # | P-2663 |
FERC project name | Pillager |
Permit issued | 4/22/98 |
Permit expiration | 3/27/28 |
Ownership and operation | |
Owner | Minnesota Power Inc |
Owner type | Investor-Owned Utility |
Year first online (conventional hydro) | 1917 |
Transmission or distribution system owner | ALLETE, Inc. |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 1.6 MW |
Average annual net hydropower generation | 9,510.5 MWH |
The project consists of a concrete gravity dam with a powerhouse having an installed capacity of 1.52 MW. The project generates on average about 8,890 MWh annually.
The dam is ia 362-foot-long concrete gravity dam with a maximum height of 28 ft.
Is there something you’d like to add or correct? Please let us know.
Related resources
Related posts
- From American Rivers 11/04/22
The mighty Mississippi running dry: what you need to know
News and updates
From California Sportfishing Protection Alliance11/24/2024
From Hydropower Reform Coalition11/19/2024
Monthly Newsletter: Exploring FERC-Exempt Hydro Projects: Small-Scale Hydropower with Big Impacts