CA
Pilot Knob
General information | |
Waterway |
Canal Filtered |
Current status | Active license  |
Type of facility | Conventional Hydro |
Mode of hydropower generation | Canal/Conduit |
Type of permit | Other |
Ownership and operation | |
Owner | Imperial Irrigation District |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1957 |
Transmission or distribution system owner | Imperial Irrigation District |
Power and generating capacity | |
Number of units | 2 |
Total capacity from hydraulic turbine-generator units within each plant | 33.0 MW |
Average annual net hydropower generation | 23,404.6 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From Trout Unlimited3/13/2024
Klamath fish reintroduction effort receives additional capacity
From Alabama Rivers Alliance3/12/2024