Pine Creek Mine P-13163

General information

Waterway  WATER DISCHARGE SYSTEM
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-13163
Permit issued 2/25/2011

Ownership and operation

Owner Bishop Tungsten Development, LLC
Owner type Industrial
Year first online (conventional hydro) 2013

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 0.2 mW
Average annual net hydropower generation 1,200.0 mWH