Plant 134 Hydroelectric Project CD15-22

General information

Waterway  Foothill Pipeline from the Devil Canyon Afterbay
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Qualifying Conduit

FERC information

FERC docket # CD15-22
Permit issued 6/3/15

Ownership and operation

Owner East Valley Water District
Owner type Political subdivision
Year first online (conventional hydro) 2018

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 0.2 MW
Average annual net hydropower generation 1,035.0 MWH