CA

Point Loma P-7510

General information

Waterway  Treated Waste Water
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Canal/Conduit
Type of permit FERC Exemption

FERC information

FERC docket # P-7510
Permit issued 12/29/1983

Ownership and operation

Owner San Diego City of
Owner type Publicly Owned Utility
Year first online (conventional hydro) 2002
Transmission or distribution system owner San Diego Gas & Electric Co

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 1.5 mW
Average annual net hydropower generation 4,362.9 mWH

From our Resource Library

License summaries, Northeast

Green Island Project, Hudson River, New York

See all resources