Potholes East Canal Headworks P-2840
General information | |
| Waterway |
Potholes Reservoir |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2840 |
| FERC project name | Potholes East Canal Headworks |
| Permit issued | 9/16/82 |
| Permit expiration | 9/26/32 |
Ownership and operation | |
| Owner | PUD No 2 of Grant County |
| Owner type | Publicly Owned Utility |
| Year first online (conventional hydro) | 1990 |
| Transmission or distribution system owner | PUD No 2 of Grant County |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 6.6 MW |
| Average annual net hydropower generation | 20,424.4 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025