VT
Pownal P-6795
General information | |
Waterway |
Hoosic River |
Current status | Active  |
Type of facility | Conventional Hydro |
Type of permit | FERC Exemption |
FERC information | |
FERC docket # | P-6795 |
FERC project name | Pownal |
Permit issued | 3/27/83 |
Ownership and operation | |
Owner | HOOSIC RIVER HYDRO, LLC. |
Owner type | Publicly Owned Utility |
Year first online (conventional hydro) | 1947 |
Power and generating capacity | |
Number of units | 1 |
Total capacity from hydraulic turbine-generator units within each plant | 0.4 mW |
Average annual net hydropower generation | 1,800.0 mWH |