AK

Purple Lake

General information

Waterway  Purple Lake
Current status   Active 
Type of facility Conventional Hydro
Type of permit Unknown

Ownership and operation

Owner Metlakatla Power & Light
Owner type Publicly Owned Utility
Year first online (conventional hydro) 1956
Transmission or distribution system owner Metlakatla Power & Light

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 3.9 MW
Average annual net hydropower generation 13,712.7 MWH

Is there something you’d like to add or correct? Please let us know.

News and updates

From Trout Unlimited11/28/2023

The Way Forward for the Eel River

See all news and updates