NY

Pyrites Plant P-6115

General information

Waterway  Grass River
Current status   Active license 
Type of facility Conventional Hydro
Mode of hydropower generation Run-of-river
Type of permit FERC License

FERC information

FERC docket # P-6115
FERC project name Pyrites
Permit issued 9/18/83
Permit expiration 8/27/23

Ownership and operation

Owner CHI Energy Inc
Owner type Private Non-utility
Year first online (conventional hydro) 1949
Transmission or distribution system owner Niagara Mohawk Power Corp.

Power and generating capacity

Number of units 3
Total capacity from hydraulic turbine-generator units within each plant 8.2 MW
Average annual net hydropower generation 28,020.0 MWH

Is there something you’d like to add or correct? Please let us know.