PA
Raystown P-2769
General information | |
| Waterway |
Raystown Branch Juniata River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Type of permit | FERC License |
FERC information | |
| FERC docket # | P-2769 |
| FERC project name | Raystown |
| Permit issued | 11/5/82 |
| Permit expiration | 10/27/32 |
Ownership and operation | |
| Owner | Allegheny Electric Coop Inc |
| Owner type | Cooperative |
| Year first online (conventional hydro) | 1988 |
| Transmission or distribution system owner | Pennsylvania Electric Co |
Power and generating capacity | |
| Number of units | 2 |
| Total capacity from hydraulic turbine-generator units within each plant | 21.7 MW |
| Average annual net hydropower generation | 88,201.6 MWH |
Is there something you’d like to add or correct? Please let us know.
News and updates
From South Yuba River Citizens League10/22/2025
Power and the River: The Yuba-Bear Hydroelectric Project and a Once-in-a-Lifetime Opportunity
From Trout Unlimited10/21/2025

