MA
Ring Shop P-12608
General information | |
| Waterway |
Mumford River |
| Current status | Active license  |
| Type of facility | Conventional Hydro |
| Mode of hydropower generation | Run-of-river |
| Type of permit | FERC Exemption |
FERC information | |
| FERC docket # | P-12608 |
| FERC project name | Alternative |
| Permit issued | 12/3/06 |
Ownership and operation | |
| Owner | Alternatives Unlimited, Inc. |
| Owner type | Private Non-utility |
Power and generating capacity | |
| Number of units | 1 |
| Total capacity from hydraulic turbine-generator units within each plant | 0.0 MW |
Is there something you’d like to add or correct? Please let us know.
News and updates
From California Sportfishing Protection Alliance11/1/2025
Measuring Flow to Support New Interim Flow Requirements in the Shasta River
From California Sportfishing Protection Alliance11/1/2025

