PR

Rio Blanco P-663

General information

Waterway  Rio Prieto
Current status  Active 
Type of facility Conventional Hydro
Mode of hydropower generation Peaking
Type of permit FERC License

FERC information

FERC docket # P-663
Permit issued 8/15/1991
Permit expires 8/15/2021

Ownership and operation

Owner Puerto Rico Electric Power Authority
Owner type State
Year first online (conventional hydro) 1930

Power and generating capacity

Number of units 2
Total capacity from hydraulic turbine-generator units within each plant 5.0 mW
Average annual net hydropower generation 17,000.0 mWH

From our Resource Library

Case Studies, Hydro guides

Activists’ Preparation Guide

See all resources