WA

Rocky Brook Hydroelectric P-3783

General information

Waterway  Rocky Brook
Current status  Active 
Type of facility Conventional Hydro
Type of permit FERC Exemption

FERC information

FERC docket # P-3783
Permit issued 7/29/1982

Ownership and operation

Owner Rocky Brook Electric Inc
Owner type Private Non-utility
Year first online (conventional hydro) 1985
Transmission or distribution system owner PUD No 1 of Mason County

Power and generating capacity

Number of units 1
Total capacity from hydraulic turbine-generator units within each plant 1.6 mW
Average annual net hydropower generation 1,604.0 mWH

From our Resource Library

License summaries, Northeast

Eel Weir Project, Presumpscot River, Maine

License summaries, Southeast

Coosa Project, Coosa River, Alabama

See all resources